Page 14 - sunumen
P. 14

CONTROL PANEL


            MANUFACTURING




             • Control panel options with pre-installed wiring tailored to the project

             • Post-production quality control procedures
             • Compliance with EN 81-20 , EN81-21, EN81-28 standarts

             • In accordance with regulations
             • Effective after-sales technical support
   9   10   11   12   13   14   15   16   17   18   19